
( Access to homes and businesses will be maintained)ĭuring construction, the Clinton River under the bridge is currently closed to boating traffic for safety reasons. Project limits: Avon Road, John R Road to 23 Mile Road, and Dequindre Road, Hamlin Road to 23 Mile Road Partner communities: Macomb County Department of Roads, Rochester Hills and Shelby Township Funding: The 8. 1)ĭequindre Road detour is Hamlin Road to Ryan Road to 23 Mile Road, back to Dequindre Road and vice versa. Project Limits/Partner Communities/Funding. Avon Road just east of Dequindre Road will completely close for bridge demolition and reconstruction staring Nov.
#8 MILE AND DEQUINDRE FREE#
(Avon Road will be closed from John R to 23 Mile however, access homes businesses and parks will be maintained. escort backpage is a site similar to adultsearch and skipthegames free classified site in the world. During this phase, access to business and park property maintained. 1, 2021 for Avon Road bridge demolition (over the Clinton River)Īpproximate end date: August 2022 (for reopening of the road including the bridge over the Clinton River and the roundabout at Avon Road/Dequindre Road)Īvon Road detour is John R to Hamlin Road to Ryan Road to 23 Mile Road and vice versa. 1)Ĭontractor/Timeframe/Road Closure/Detour: Tree removal (expected to start on Nov.Great Lakes Water Authority watermain replacement.2 other reviews that are not currently recommended. High-intensity Activated cross Wal K (HAWK) pedestrian crossing devices at roundabouts HELL I DONT usually SHOP IN THE NEIGHBORHOOD STORES THAT OFTEN, BUT DAMN SURE WONT BE GOING BACK TO IMPERIAL ON 8 MILE AND DEQUINDRE 1 of 1.Construction of a retention pond and placement of decorative concrete with aesthetic features.Updated pathways both sides of Avon Road Rite Aid On Dequindre An 8 Mile in Detroit, MI with.Reconstruction of Avon Road, including milling and resurfacing between Cider Mill Boulevard and new roundabout at Dequindre and Avon Road.Stabilization of the Clinton River banks.Pedestrian facilities to connect the three adjacent parks and Yates Cider Mill.Avon Road bridge replacement over the Clinton River (bridge work starts early November, 2021).A three-lane road between the roundabouts with a continuous center, left-turn lane (part of Great Lakes Water Authority work).Roundabout construction at Avon Road/23 Mile Road (will be done in conjunction with Great Lakes Water Authority work).

Roundabout construction at Avon Road/Dequindre Road intersection (starting in March of 2022).
